Workstation Rackmount (1U High Density Node) — Packaging & Query Guide
📦 Packaging Instructions (Mandatory Before Shipping)
- Back up all critical compute, virtualisation, or cluster data before dispatch.
- Shut down node cleanly (no forced power-off unless emergency condition applies).
- Disconnect all network cables (dual NIC / fibre / Ethernet) and labeling modules.
- Remove or secure all hot-swap drives before transit where applicable.
- Lock or stabilise rail-mount ears to prevent chassis flex in transport.
- Wrap unit in anti-static protective sleeve covering full chassis length.
- Protect front airflow panel and rear I/O stack with rigid inserts.
- Use high-density foam end-caps to protect rack ears and structural frame.
- Apply at least 60mm shock-absorbing material on all sides (1U units are vibration sensitive).
- Use reinforced double-walled box rated for server-grade equipment.
- Ensure no lateral movement under shake/vibration conditions.
📌 Customer Query / Support Form
Use this form for packaging support, fault reporting, cluster/node issues, upgrade enquiries, or general repair assistance.